About client

Wild Avenue,is situated in ,Munnar Road, Kumily,Idkki. Initiated a significant project in 2022 involving the design and installation of a Sewage Treatment Plant (STP). Boasting a daily capacity of 50 cubic meters,Involving the design and installation of a Sewage Treatment Plant (STP). This treatment plant working as per    Global Labs System Technology (GLC).

   

Remarkable Sewage Treatment Plant (STP) at Wild Avenue Resort in Kumily, has installed an efficient wastewater management system without compromising on quality. Here’s what makes it special:

Space Optimization:Challenging Context: Wild Avenue Resort faced limited space for STP installation. However, they turned this constraint into an opportunity for innovation.

Compact Design: The STP was meticulously planned to fit within the available area. Every square meter counted, and the resort’s commitment to environmental responsibility drove their design choices.

Quality Assurance:Robust Treatment Process: The STP employs advanced treatment methods, including biological processes, filtration, and disinfection. It ensures that wastewater is thoroughly treated before discharge. Stringent Standards: Wild Avenue Resort maintains high-quality standards, adhering to local regulations and environmental norms. Water leaving the STP meets stringent parameters, safeguarding the ecosystem.In-House Expertise:Employee Involvement: Resort staff actively participate in STP operations and maintenance. Their dedication ensures smooth functioning and timely troubleshooting.drove their design choices.Quality Assurance:Robust Treatment Process: The STP employs advanced treatment methods, including biological processes, filtration, and disinfection. It ensures that wastewater is thoroughly treated before discharge.Stringent Standards: Wild Avenue Resort maintains high-quality standards, adhering to local regulations and environmental norms. Water leaving the STP meets stringent parameters, safeguarding the ecosystem.

Project information

Organization

Wild Avenue Resort & Spa

Location

First Mile,Munnar Road,Thekkady,Kumily.

Service Provided & Year

STP - Design, Installation (2021)

Technology

GS (Global System, an Integrated System of Anaerobic & Aerobic biodegradation process.) + Moving Bed Biofilm Reactor (MBBR)

Capacity

50 cubic meters per day

Project goals

In 2017, Gagultha Retreat Centre in Thalakkottukara, Thrissur, embarked on a significant project with the design and installation of a Water Treatment Plant (WTP), featuring a daily capacity of 200 cubic meters and incorporating both Global System (GS) and Moving Bed Biofilm Reactor (MBBR) technologies. The primary goals of this initiative were to ensure a reliable and purified water supply for the retreat centre, reflecting Gagultha Retreat Centre’s commitment to providing a sustainable and high-quality environment for spiritual retreats and gatherings. By integrating advanced water treatment methods, the project aimed to ensure access to purified water resources, contributing significantly to the centre’s ability to offer a serene and spiritually enriching experience while maintaining responsible resource management practices. This project underscores Gagultha Retreat Centre’s vision of fostering spiritual well-being in Thalakkottukara, Thrissur.

×